Feasibility Is A Relationship Between Questions
A proposal can be commercially attractive yet depend on a technical condition that has not been tested. It can also be technically possible without having a workable operating model. Feasibility is therefore best understood as a connected body of enquiry. The challenge is to establish which questions matter, who is qualified to answer them and how those answers affect the next decision.
Coordination Gives The Enquiry A Structure
Feasibility coordination defines the purpose of each workstream, identifies available information and makes dependencies explicit. It may involve briefing specialists, organising inputs and maintaining a record of assumptions. Its value lies in helping participants work from compatible requirements, so that one study does not proceed on conditions another has already questioned.
Different Roles Within A Feasibility Conversation
Commercial Question
Define the decision and information requirement.
Coordination
Connect workstreams, inputs and responsibilities.
Specialist Judgement
Qualified providers undertake technical assessment.
Decision Basis
Consider findings and limits before commitment.
Technical Judgements Need Technical Accountability
Engineering capacity, structural suitability, environmental effects and other specialist matters require competent professional assessment. Coordination does not confer the authority to certify those findings. The scope should identify the responsible provider, their commission and the status of the work. APDC’s development support should be described separately from any specialist service commissioned for the project.
Keep The Commercial Case Open To Evidence
A study should be allowed to change the proposition. If a connection is impractical, an operator requirement differs from the original concept or an approval pathway creates a constraint, the commercial plan needs to respond. Evidence is useful precisely because it can challenge an attractive initial idea. A feasibility process that cannot revise its assumptions has lost an essential purpose.
Close A Stage With A Decision Record
Summarise what has been established, what remains conditional and what further work is needed. Identify the implications of each unresolved issue for scope, timing and responsibility. The next step may be further assessment, a revised concept or a decision to stop. A useful coordination output makes that choice intelligible without disguising uncertainty as confidence.